Technical Review Panel for the Pension Insurance Modeling System (PIMS)

Published: 2013

Abstract

In April of 2013, the Pension Research Council of the Wharton School at the University of  Pennsylvania convened a Technical Review Panel, comprising ten experts whose task it was to  review the Pension Benefit Guaranty Corporation’s (PBGC) Pension Insurance Modeling System  (PIMS), including inputs, outputs, and model assumptions. The review was intended to provide a  formal evaluation of the technical adequacy of the model by outside experts. Each expert  participating on the Technical Panel was asked to review background material (see References)  and focus on a particular aspect of the PIMS model. The list of panelists and topics was  developed by the Council in discussion with the Social Security Administration (SSA). This  report and the appended papers herein from our Technical Panel comprise the Final Report under  this project.

Key Findings

    The Panel’s key findings may be summarized as follows:

    1. The PIMS models are an important and valuable tool in modeling the Agency’s liability risk. To the best of our knowledge, there is no other model that can do a comparable job.

    2. Nevertheless, some improvements could be integrated in the Agency’s approach to modeling. Those deserving highest priority attention in the experts’ view are the following:

    • Incorporating systematic mortality risk (i.e., treat mortality and longevity as stochastic variables);
    • Including new asset classes increasingly found in defined benefit plan portfolios (e.g., commercial real estate, private equity funds, infrastructure, hedge funds, and others);
    • Developing a more complex model for the term structure of interest rates; and
    • Incorporating an option value approach to pricing the insurance provided.

    3. The Agency could also do more to communicate the range of uncertainty and potential for problems associated with the PBGC’s financial status. This could include additional information including the Conditional Value at Risk, and perhaps an ‘intermediate,’ ‘optimistic,’ and ‘pessimistic’ set of projected outcomes, as well as the expected ‘date of exhaustion’ for assets backing pension benefits insured by the PBGC.